How to Install Parquet Hardwood Flooring - A Comprehensive Guide

Parquet flooring brings timeless style and “wow” factor to a home, but it installs differently than typical plank hardwood. The key is simple: great prep, correct moisture conditions, careful layout, and consistent adhesive coverage. This guide rewrites and expands older parquet instructions into an easy-to-follow installation playbook so your parquet looks incredible and performs for years.

 

Parquet Flooring Installation

What is parquet flooring?

 

Introduction

 

To install parquet successfully, start by confirming the jobsite is dry, stable, and within temperature/humidity targets. Prep the subfloor until it’s clean, flat, sound, and dry. Plan your layout carefully (parquet patterns show mistakes fast), then spread the correct adhesive with the correct trowel and place panels promptly, keeping hairline gaps so panels don’t “float” on adhesive ridges.

 

Trim as you go, keep expansion space around the perimeter, and do routine checks for adhesive transfer and coverage. After curing, sand and finish (if unfinished parquet), then follow a simple care routine. Hardwoods4Less recommends using a qualified installer for the best results—parquet is absolutely doable, but it rewards patience and precision.

 

Table of Contents

 

 

Before You Begin: What Matters Most

 

1) Inspect everything before you install. Open multiple cartons and check for damage, obvious defects, or incorrect product. Color and grain variation is normal in real wood—especially across multiple boxes—so plan to blend pieces from several cartons as you go for the best look.

 

2) Installation = acceptance. If you install a panel with an issue you noticed beforehand, it’s hard to claim that issue later. Set questionable pieces aside and contact your supplier first. Hardwoods4Less is always happy to help you troubleshoot before you commit panels to adhesive.

 

3) Parquet is detail-sensitive. A small layout error, a crooked starting line, or uneven adhesive coverage can show up repeatedly across the whole floor. Take your time on prep and layout—your finish will thank you.

 

4) Follow the adhesive manufacturer’s directions. Cure time, trowel notch size, spread rate, open time, and cleanup are all product-specific. This guide gives best practices, but your adhesive instructions are the final word.

 

5) Safety note (especially for older remodels). If you’re removing old flooring or sanding old adhesives, be cautious—some legacy materials may contain asbestos. If you suspect that possibility, stop and consult a certified professional before disturbing old layers.

 

Tools & Materials

 

Here’s a practical list for most parquet installs:

 

Measuring & layout:

 

Tape measure, chalk line, carpenter’s square, pencil/marker, straightedge

 

  • Surface prep: Broom, vacuum (HEPA recommended), scraper, floor patch/leveling compound as needed, sanding equipment for subfloor high spots (as appropriate), moisture test kits/meters

 

  • Cutting: Band saw or miter saw (band saw is helpful for certain parquet cuts), extra blades, narrow masking tape (great trick for cleaner diagonal cuts and less splintering)

 

  • Installation: Premium parquet adhesive, notched trowel (size per adhesive spec), rubber mallet, tapping block, rags, and the adhesive manufacturer-approved cleaner (often mineral spirits or a specific remover—only use what the adhesive brand approves)

 

  • Finishing (if using unfinished parquet): Floor sander/buffer, sanding screens/paper, vacuum, stain (optional), finish system (water or oil-based), applicators, and compatible wood filler

 

Jobsite Conditions: Temperature, Humidity, Acclimation

 

Wood is hygroscopic; it gains and loses moisture with the environment. If you install parquet when conditions are unstable, you can end up with gaps, cupping, or movement.

 

Target conditions (general best practice):

 

Keep the space at normal living conditions for the home. Many installers aim around 60–80°F and 35–55% relative humidity, but always defer to the flooring/adhesive requirements and local climate realities.

 

Before installation:

 

Finish “wet work” first (drywall mud, plaster, paint, concrete curing, etc.). Run HVAC so the building is at living conditions. The older instruction set referenced a minimum room temperature around 60°F before installation; in practice, stable conditioned air is the real goal.

 

Acclimation:

 

Acclimate parquet according to product specs and site conditions. Some engineered parquet products acclimate faster than solid; some adhesives also limit what “acclimation” means. The safest approach is to let the material rest in the installation area (cartons opened if instructed) while you verify subfloor moisture is within limits.

 

Subfloor Preparation (The Step People Skip)

 

If parquet fails, it’s usually not because parquet is “bad.” It’s almost always one of these: dirty subfloor, uneven subfloor, moisture issues, wrong adhesive/trowel, or rushed layout.

 

Step 1: Clean, clean, clean.

 

Remove dust, paint, wax, oil, old adhesive residue (as required), and any debris that prevents a strong bond. Vacuum thoroughly.

 

Step 2: Make it flat.

 

Parquet telegraphs unevenness more than long planks because pattern lines and edges create visual “grids.” Check flatness with a long straightedge. Sand down high spots and fill low spots with an appropriate patch/leveling compound that your adhesive manufacturer allows.

 

Step 3: Make it sound.

 

Fix squeaks, loose panels, or soft spots. Replace compromised wood subfloor areas. On concrete, remove weak/crumbly surface material.

 

Step 4: Treat concrete correctly.

 

If concrete has curing compounds, sealers, paint, old glue, or other contaminants, they must be removed according to industry-accepted methods and adhesive requirements. Some older guidance suggests “disking” or sanding; today, the correct method depends on the slab and adhesive system. Your adhesive manufacturer will specify acceptable prep profiles (often a CSP profile).

 

Moisture Testing: When to Test and What It Means

 

Moisture is not a “maybe” with parquet, it’s a “must verify.” Test and document moisture before installation. If moisture is too high, do not install until you address it with drying time, mitigation, or a different approved system.

 

For concrete slabs:

 

Common methods include calcium chloride testing and in-situ relative humidity (RH) testing. The older instructions referenced examples like calcium chloride (with a maximum emission guideline) and other moisture readings. Modern adhesives often specify exact RH or MVER limits—follow those product limits and local standards.

 

For wood subfloors:

 

Use a reputable moisture meter designed for wood. A typical target is that the subfloor moisture content and flooring moisture content are close—many installers aim for a small variance (often within a few percentage points), but the “right” number depends on species, product type, and region. What matters is consistency and being within the flooring/adhesive requirements.

 

Ventilation matters.

 

Good cross-ventilation and stable HVAC conditions help the space stay dry during installation and cure.

 

Layout Planning for Parquet Patterns

 

Parquet looks best when it’s intentional. A strong layout plan prevents thin slivers at walls, misaligned borders, and pattern drift.

 

1) Find your reference lines.

 

For many parquet patterns, starting from the center of the room gives the most balanced look. Snap a chalk line for your main reference, then snap a second line square to the first (use a carpenter’s square and/or a 3-4-5 triangle method to confirm squareness).

 

2) Dry lay a test area.

 

Before you open adhesive, dry lay several panels along each direction to confirm the pattern, verify how it meets the walls, and decide whether you want the pattern centered, shifted, or aligned to a specific feature (like a fireplace or long hallway view).

 

3) Plan transitions and borders.

 

Decide ahead of time where the parquet stops, how it meets tile/carpet, and where expansion breaks may be needed for large areas (follow your product specs).

 

Pro tip from Hardwoods4Less: If the room is not perfectly square (most aren’t), trust your reference lines, not the walls. A consistent pattern reads as “high end,” even if the cuts near a wall need to vary slightly to maintain a straight field.

 

Adhesive Selection & Trowel Basics

 

Parquet is typically installed using a wood flooring adhesive. The adhesive has a working time (open time) and a required spread rate. If you spread too far ahead, adhesive can skin over. If you use the wrong trowel notch, coverage may be too thin or too thick.

 

Choose the right adhesive.

 

Use a premium adhesive specifically rated for parquet/wood flooring and for your substrate type (concrete vs plywood/OSB). Some adhesives include moisture control benefits; others require separate mitigation systems. Always match the adhesive system to the job conditions.

 

Use the right trowel notch.

 

The older instructions referenced a notched trowel recommendation and a general coverage estimate; modern adhesives specify the exact notch size and expected coverage per gallon. Follow that. If you change trowels, you change coverage.

 

Spread rate matters.

 

A common failure is spreading too little adhesive (poor bond) or too much (mess, squeeze-through, panels “floating” and sliding). You want consistent ridges that collapse properly under the panel when pressed in.

 

Installation Steps (Panel-by-Panel)

 

These steps assume an adhesive-set parquet panel (often with a backing). Adjust as needed for your specific parquet construction and the adhesive requirements.

 

Step 1: Final vacuum and layout marks.

 

Vacuum the subfloor thoroughly. Re-snap reference lines if needed. Confirm you have a clear plan for your starting area and direction of work.

 

Step 2: Start where you can work away from fresh flooring.

 

Parquet panels can shift if you walk on them too soon. Plan your path so you’re not stepping on newly laid panels. Many installers begin at a reference line and work out, always leaving a clean exit route.

 

Step 3: Spread adhesive in a manageable area.

 

Using the correct notched trowel, spread only as much adhesive as you can cover within the adhesive’s open time. Hold the trowel at the correct angle so ridges are consistent.

 

Step 4: Place panels promptly and accurately.

 

Lay panels into the adhesive immediately after spreading. Align the first panels carefully to your chalk lines—this controls the entire field. Take extra time on the first few rows/panels.

 

Step 5: Keep hairline gaps between panels (do not force tight).

 

One common parquet issue is pushing panels too tightly together. Many parquet panels are held together by a backing, and forcing tight joints can cause peaking, compression, or pattern distortion. Aim for consistent, very small hairline gaps as the pattern dictates so panels can seat and settle evenly.

 

Step 6: Seat panels fully into the adhesive.

 

Press panels down firmly to collapse adhesive ridges and ensure full contact. Use a rubber mallet and tapping block as needed—carefully—so you don’t damage the wood. The goal is full transfer, not bruising the surface.

 

Step 7: Clean adhesive immediately (while it’s fresh).

 

Wipe off any adhesive squeeze-through right away using the adhesive manufacturer-approved cleaner and method. Waiting makes cleanup harder and can affect finishing later.

 

Step 8: Continue with consistent checks.

 

As you progress, maintain straight pattern lines, confirm panels are seated, and keep adhesive coverage uniform. Consistency is what makes parquet look “designer installed.”

 

Expansion Space, Trimming-In, and Working Strategy

 

Leave perimeter expansion space.

 

Wood expands and contracts. Leave an expansion gap around the entire room perimeter and around permanent fixtures (columns, cabinets, islands, pipes). Older guidance commonly referenced approximately 5/16 inch around the perimeter; your product may require a different gap based on room size and product type. When in doubt, follow the flooring manufacturer’s requirement.

 

Trim as you go (“trimming-in”).

 

Don’t wait until the end to do all perimeter cuts. Trimming as you progress helps maintain alignment and reduces the chance of stepping on fresh work. Use masking tape on cut lines for cleaner diagonal cuts and to reduce splintering when appropriate.

 

Work away from newly installed flooring.

 

This reduces the chance of shifting panels out of position. It also helps keep the pattern clean and prevents accidental adhesive tracking.

 

Quality Checks During Installation

 

Professional installers check their work continuously. Here are the most important parquet checks:

 

1) Adhesive transfer check (the “lift test”).

 

Occasionally lift a newly placed panel to confirm adhesive contact/transfer. You want strong, consistent transfer across the back. If coverage is poor, you may need to adjust trowel notch, angle, or subfloor prep.

 

2) Watch for too much adhesive.

 

If panels slide excessively or adhesive squeezes up between slats/pieces, you may be spreading too heavily or using the wrong trowel. Too much adhesive can also make it harder to keep the pattern crisp.

 

3) Confirm alignment regularly.

 

Step back and visually check pattern lines. Use a straightedge along key pattern runs. Small errors early become big errors later.

 

4) Confirm seating.

 

A parquet field should feel solid, not hollow. Poor seating can lead to movement and noise. If the adhesive allows, use a weighted roller only if the product/adhesive manufacturer approves it (some parquet constructions do not want heavy rolling).

 

Sanding & Finishing

 

This section applies to unfinished parquet or parquet that requires site finishing. If you purchased prefinished parquet, follow the manufacturer’s specific instructions and skip to Care & Maintenance.

 

Wait before sanding.

 

Allow the adhesive to cure fully before sanding. Older instructions often referenced a minimum of about 24 hours; modern adhesives vary widely. Follow the adhesive manufacturer’s cure time before sanding or heavy traffic.

 

Sand with a parquet-appropriate process.

 

Parquet patterns can be more sensitive to aggressive sanding because grain direction changes from piece to piece. A professional sanding approach (proper grit sequence, careful edging, and thorough vacuuming between steps) prevents swirl marks and uneven appearance.

 

Filling joints (if needed).

 

Many parquet floors need filler at some point—often after the first sanding. Use a filler compatible with your finish system. For best results, confirm compatibility with your finish manufacturer.

 

Finish application.

 

Use a quality hardwood floor finish and apply per manufacturer instructions. Keep the room clean and dust-controlled during finishing for the best final appearance.

 

Care & Maintenance

 

A well-installed parquet floor is low-maintenance, but it does best with the right routine:

 

Daily/weekly:

 

Sweep or vacuum with a soft-brush attachment. Grit is the enemy—it acts like sandpaper under shoes.

 

As needed:

 

Use a wood-floor-approved cleaner (not oil soap, not steam, not soaking wet mops). Wring mops well—wood and standing water don’t mix.

 

Protect the floor:

 

Use felt pads under furniture, use walk-off mats at entrances, and keep pet nails trimmed. Maintain stable indoor humidity to minimize seasonal movement.

 

Hardwoods4Less tip: If you want parquet to stay looking “new,” the biggest win is preventing grit at entry points. A good mat system is cheaper than a refinish.

 

Where Parquet Can (and Can’t) Be Installed

 

Parquet flooring can be installed over several substrates when properly prepared, but there are important limitations.

 

Common suitable substrates (when dry, flat, and sound):

 

Wood subfloors such as plywood/OSB (installed correctly), tongue-and-groove wood subflooring (with prep), and properly prepared concrete slabs that meet moisture requirements.

 

Concrete notes:

 

On-grade and suspended slabs can work well if the slab is dry and properly prepped. If moisture is high, use an approved moisture mitigation system—do not “hope it’s fine.”

 

Not recommended without an approved system:

 

Below-grade basements (especially if moisture-prone), installations over resilient/vinyl flooring, or over asphaltic/unknown adhesive layers—unless your flooring and adhesive manufacturers explicitly approve the method and conditions.

 

Warranty & Responsibility Notes (Plain English)

 

Most parquet warranties cover manufacturing defects, not jobsite conditions or installation errors. That means the installer/homeowner is responsible for verifying the subfloor is suitable, moisture is within limits, and the installation method matches product requirements.

 

Document your moisture testing and jobsite conditions. It protects you and helps diagnose problems if anything ever comes up later.

 

At Hardwoods4Less, we’re big believers in transparency: the best-looking parquet floor starts with the best prep, the right adhesive system, and realistic expectations about natural wood variation.

 

Getting Started

 

If you’re planning a parquet project and want it to go smoothly, here’s the simplest way to begin:

 

1) Confirm your parquet product and installation method.

 

Is your parquet solid or engineered? Prefinished or unfinished? Glue-down only or another method? Match the plan to the product.

 

2) Measure the space and plan the layout.

 

Decide whether you want the pattern centered, aligned to a focal point, or oriented to a hallway/main sightline. Dry lay a small section to confirm the visual.

 

3) Verify subfloor type and moisture.

 

Concrete vs wood matters. Test moisture and document results before you buy adhesive and start spreading.

 

4) Choose the correct adhesive system.

 

Buy the adhesive recommended for your parquet and subfloor conditions, including any required primer/moisture system.

 

5) If you want a second set of eyes, just ask.

 

Send Hardwoods4Less your subfloor type, room size, and product choice, and we’ll help you sanity-check the plan so you can install with confidence.

 


Article Author

Justin Bullan
Written by Justin Bullan, Parquet Hardwood Expert — Helping You Choose the Right Floor the First Time.

 

 

Back to blog